Brezac Constructions has purpose built a production facility within the Crestmead Industrial Estate.

  • The ability to achieve 12,000 man hours a month
  • 3000 m2 under roof
  • 7 meters under hook
  • 3 x 10 tonne overhead cranes
  • 1 x 5 tonne overhead crane

This facility has been built with production efficiencies in mind.

The facility includes:

  • Drive-through capacity enabling one-way semi-trailer circulation onsite and within the building
  • The ability to achieve 12,000 man hours a month
  • 3000 m2 under roof
  • 7 meters under hook
  • 3 x 10 tonne overhead cranes
  • 1 x 5 tonne overhead crane